@@ -65,6 +65,9 @@ Ansible-driven personal infrastructure repo for Fedora and Void desktops, Fedora
`ansible-playbook ansible/site.yml --limit atlas --tags gitea_final_restore --check --diff -e atlas_gitea_final_restore=true`
- Prometheus final Gitea export helper (dry-run installs only; outage action remains opt-in):
`ansible-playbook ansible/site.yml --limit prometheus --tags gitea_final_export --check --diff`
- Gitea cutover network configuration before activation:
`ansible-playbook ansible/site.yml --limit prometheus --tags gitea_cutover,prometheus_backup --check --diff -e server_gitea_on_atlas=true`
and `ansible-playbook ansible/site.yml --limit atlas --tags gitea --check --diff`
- Atlas network/share hardening:
`ansible-playbook ansible/site.yml --limit atlas --tags hardening,sharing --check --diff`
- Atlas ZFS snapshot retention and scrub timers:
@@ -289,7 +292,8 @@ successfully. The first monthly scrub remains a runtime check.
and snapshot mounts were removed, the Borg service ended successfully, and the pool was healthy.
- [ ] Include the new Gitea dataset in the next UUID-bound offline USB version and test a file restore
from that version before accepting production writes; the UUID-bound disk is connected but its
LUKS mapper is closed, so the manual backup still requires interactive unlock.
LUKS mapper is closed, so the manual backup still requires interactive unlock. On 2026-10-01 the
operator could not unlock it and chose to defer traffic cutover until this check passes.
- [x] Install a separate opt-in final Gitea export helper on Prometheus. Its 2026-10-01 targeted
deployment and `bash -n` passed while Gitea and NPM stayed running. It refuses an active export
timer, stops only Gitea, verifies SQLite, publishes a checksum-verified Gitea-only version for
@@ -299,6 +303,12 @@ successfully. The first monthly scrub remains a runtime check.
layout before replacing the marked rehearsal, and rolls back a failed swap. Synthetic success
and rollback tests and a second idempotent rehearsal run passed on 2026-10-01; the final gate
has **not** been invoked.
- [x] Prepare, but do not activate, the Atlas LAN rootless Quadlet and Prometheus TCP/2222 socket
proxy. NPM's two existing `gitea:3000` Proxy Hosts will resolve that name to Atlas through a
managed Compose `extra_hosts` entry after the source container is removed; no NPM database edit
is needed. The future-mode Prometheus check-run passed, both current-mode runs were idempotent,
the new systemd units passed verification, and source HTTP remained 200 on 2026-10-01. Public
2222 is closed and the target remains inactive until the explicit cutover flags are enabled.
- [ ] After an explicit outage approval, perform the final consistent copy and HTTPS/SSH cutover,
then remove Gitea from Prometheus' desired stack and backup export without deleting source data.
- [ ] Design and deploy Nextcloud as another explicitly temporary Atlas service before Uranus. Give it